Despite the intense sun, some 4,500 people stood in line yesterday on the San Francisco promenade to deposit their ballot in the referendum called by the CB Foundation to demand a 21st century train for Extremadura. It was a symbolic gesture, which is why mass...
It will be at the dawn, in the middle or at the end of 2020. It will take almost three years for the Extremaduran railway to take the first step towards what must be a modern and fast future that resists arriving in the region, but throughout that period. The first...
The objective is to allow access to Merida for “high speed” traffic once the new connection to Extremadura that is currently under construction has been put into service. The works have a term of execution of four months. Once “renewed”,...
Regarding the Extremadura train there is a feeling that this region is forgotten, but also that for the first time there is an outrage shared by most of the population , which requires the authorities a faster and better-performing train than the current one....
The ADIF Alta Velocidad entity has begun operations to install the rail and sleepers on the Mérida-Badajoz section of the Madrid-Extremadura High Speed Line, as part of the track assembly works that are underway in this section. Specifically, the assembly of the...
Five passengers were waiting in Cabeza del Buey (Badajoz) at 07.20 in the morning this Wednesday for the regional train 17812 to start. But the railway was unable to start due to a traction failure , Renfe reports. As a resource, the operator put two taxis for its...