Renfe has implemented a series of urgent measures to improve the reliability of the trains that serve Extremadura. A permanent working group will be created to monitor and comply with them.

Urgent measures:

  • Revision of the engines and replacement of those with any anomaly.
  • Replacement of train wiring.
  • A new technical assistance post will be created in Badajoz with a pit for vehicle inspections.
  • Delivery of a complete report on incidents registered throughout the year.

Renfe will study:

  • Change of rolling stock.
  • Creation of a workshop in Badajoz.
  • Appointment of a Renfe interlocutor in Extremadura.

SOURCE: VIVIR EL TREN.ES

Scroll Up